Afsluitdijk Dam









The Afsluitdijk is a major dam and causeway in the Netherlands. It was constructed between 1927 and 1932 and runs from Den Oever in North Holland province to the village of Zurich in Friesland province, over a length of 32 kilometres (20 mi) and a width of 90 metres (300 ft), at an initial height of 7.25 metres (23.8 ft) above sea level.

Afsluitdijk Dam
The Afsluitdijk is a fundamental part of the larger Zuiderzee Works, damming off the Zuiderzee, a salt water inlet of the North Sea, and turning it into the fresh water lake of the IJsselmeer. The dam serves as a sea barrier to protect the inland against flooding. The motorway on the Afsluitdijk was the initial demonstration site for a 130 km/h (81 mph) speed limit in the Netherlands.


Rijkswaterstaat will strengthen the Afsluitdijk in the coming years to safeguard its future and to continue to protect the Netherlands against the force of water. Its renovation began in 2018. The government has taken this opportunity to give room to more initiatives. As part of the renovation programme, Roosegaarde's Icoon Afsluitdijk enhances the iconic status of the Afsluitdijk with a second layer of light and interaction. The three designs of light and interaction developed by Daan Roosegaarde and his team are entitled Gates of Light, Windvogel and Glowing Nature. Development Partners for this project are: Kitepower, Wageningen University and Research, TTB, Eurocarbon, Versalume. More details